عربي

Energy and oil

Two Wasco yards would join NMDC Energy’s footprint; Jebel Ali is already there

The deal would add two Wasco yards to NMDC Energy’s footprint, alongside a third site the company already operates. Wasco’s Batam yard in Indonesia spans more than 380,000 square meters; its Malaysian process-equipment yard covers 110,000. The 25,000-square-meter yard in Jebel Ali, UAE, is already operated by NMDC Energy, not one of the Wasco sites in the acquisition. The added capacity could help the company take on larger, more complex offshore projects and provide a base closer to customers and projects in Southeast Asia.

3 publishers3 reports

Key Actors

  • NMDC Energy
  • Wasco Berhad

Coverage

SRMED brings what publishers report about one story into one place. The headline and summary are ours; each report belongs to its publisher.

Takedown requests and contact