عربي

Energy and oil

Algeria and Niger discuss technical preparations for trans-Saharan gas pipeline

Asharq News reported that an Algerian energy-ministry delegation discussed the project in Niamey last week, focusing on accelerating technical studies for the route through Niger and identifying the next operational steps. Asharq Business with Bloomberg describes the planned line as carrying natural gas from Nigeria through Niger to Algeria and onward to Europe. Its initial capacity target is about 20 billion cubic meters a year, with potential to rise to 30 billion. The coverage distinguishes preparations in Niger from work on Algeria’s section; the talks are preparatory progress, not evidence that construction has resumed across the full three-country route.

3 publishers4 reports

Coverage

SRMED brings what publishers report about one story into one place. The headline and summary are ours; each report belongs to its publisher.

Takedown requests and contact