Energy and oil
Bacalhau’s shutdown is expected to last five to eight weeks.
At Brazil’s Bacalhau field, a falling object damaged equipment on the production vessel and stopped output. No one was injured. Equinor told Brazil’s oil regulator that the shutdown was expected to last five to eight weeks, depending on the steps needed for a safe restart. So the estimate is a window, not a set restart date: it depends on what is needed before the field can resume production.
2 publishers2 reports
Key Actors
- Equinor ASA