عربي

Energy and oil

Bacalhau’s shutdown is expected to last five to eight weeks.

At Brazil’s Bacalhau field, a falling object damaged equipment on the production vessel and stopped output. No one was injured. Equinor told Brazil’s oil regulator that the shutdown was expected to last five to eight weeks, depending on the steps needed for a safe restart. So the estimate is a window, not a set restart date: it depends on what is needed before the field can resume production.

2 publishers2 reports

Key Actors

  • Equinor ASA

Coverage

SRMED brings what publishers report about one story into one place. The headline and summary are ours; each report belongs to its publisher.

Takedown requests and contact