Energy and oil
Two Norwegian fields face production disruptions for different reasons.
At Norway’s Visund field, a fire in a backup electrical switch room shut production down, with the outage expected to last about two months. Johan Castberg’s temporary production halt had a different cause: oil could not be offloaded at the time. The two interruptions bring distinct operational problems in Norway into the same lower-growth picture as the equipment damage at Bacalhau in Brazil.
2 publishers2 reports
Key Actors
- Equinor ASA